CorePoolCoolantTank80 kL Primary Circuit CoolantTank150 kL Pressurizer Pressure Relief Tank Waste M02 M01 M03 Tunnel External Water SourceUnlimited ExternalCoolantReservoir500 kL ExternalPrimary Pump InternalPrimary Pump ExternalChemical Pump Cleaning Pump Boric AcidDosing Pump Boron Filter Pump Core Pool Pump Steam GeneratorEvaporator PoolFront of Building Feedwater Pump C o n d e n s e r A1Pump B1Pump C1Pump A2 Pump B2 Pump C2 Pump D1Pump Condenser Pump CondenserEvaporator PoolBack of Building NaOH TankOutlet Valve Sodium HydroxideReserve Boric AcidReserve Water TankOutlet Valve Ion ColumnOutlet Valve Ion ColumnInlet Valve Boric Acid TankPurge Valve NaOH TankPurge Valve Boric Acid Cleaning Water NaOH Ion Column Purge Valve Relief TankVent Valve PressurizerVent Valve RCV Core VentValve CoolingValve(spray) C1Valve B1Valve A1Valve C2Valve B2Valve A2Valve C3Valve B3Valve A3Valve Core Vessel250 kL CoreOuterVessel150 kL Steam Generator C60 kL Steam Generator B60 kL Steam Generator A60 kL STG CDrain Valve STG BDrain Valve STG ADrain Valve A4ValveMSCV B4ValveMSCV C4ValveMSCV A5Valve B5Valve BypassValve A6Valve B6Valve C6Valve CondenserDrainValve Chemical Treatment Room - L0-2 L2L1 L1L0 Chemical Loading Room - L2 Condenser Room - L0 Generator Turbine Room - L3 Reactor Core Containment Room - L0 Turbine A Vent Valve Turbine B Vent Valve Turbine C Vent Valve Nucleares Piping and Plumbing DiagramGame Version: 2.2.23.190Updated on: 29 MAY 2025Created by: KerBallOne Circulation PumpDesigned forextended operation Freight PumpDesigned forintermittent operation Valve with handlemanual operation only Valve with wheelautomatic control withbypass for manual operation Valveautomatic operation only Pipefor liquid Pipefor steam 360 kL TurbineVent Tank C5Valve BypassValve BypassValve Fuel Tank Fuel3400 L Genset Room WasteTank